Tuesday, October 26, 2010

Kitchen Renovation


Well its begun. The kitchen renovation is finally here! I am so excited to tell you all about it. So in late September my husband and father in law came through again to handle the demolition. The demo went really well and really quickly. However no renovation would be complete without a few snafus and believe me we had our fair share. To tell the whole story I should start from the very beginning.





After working with a general contractor on our Bathroom renovation, Andrew and I decided we could do this renovation on our own by hiring out and managing the sub contractors without a GC. As you will see from our experience thus far, this is not a decision for the weak hearted. It has caused considerable stress and anxiety. However, it is saving us A LOT of money. So here is how it we started the process.

Design our cabinet layout and purchase cabinets - these usually have the longest lead times (5-6 weeks), so this was the first decision that needed to be made. We chose to use Andersonville Kitchen and Bath. They were wonderful to work with, however we shopped around and discovered that Lowe's was offering a some major discounts. I always prefer to work with local vendors and contractors as they are much more likely to have better customer service. I told Andersonville that I wanted to purchase the cabinets through them, however I was hoping they could beat or match Lowes' pricing, and they did! I think this is true for most things in the construction world, always ask for a better deal! 9 times out of 10 you'll get it!

The design for our kitchen is below. Since we decided to eliminate the cabinets over the penninsula (see the before photo above), I chose really, really tall cabinets in the rest of the kitchen (they're 54"!). Not even Andrew will be able to reach the top shelf without a ladder, but it will provide a ton of concealed storage and is perfect for items that aren't used on a regular basis, such as your crock pot or martini glasses.



Next step...
Determine the sub-contractors and obtain pricing:
Electrician - Traian Electrical - Traian is wonderful! He worked on our bathroom, however one little inconvenience is that he already planned a trip to his home country of Romania right when we were planning on starting our project. However I knew he did amazing work for a great price, so I was willing to schedule around his trip. On a side note, Traian had not been home for 7 years - can you believe that? His wife hadn't been back for 30 years! Needless to say he was really sad to come back to the states.
Plumber - Since the plumbing on this project only entails hooking up our kitchen faucet. Andrew and I decided to conquer this task on our own.
Drywall - Morfin Drywall
Flooring - Cornell's Flooring - We decided the cost to replace the tile was about the same as replacing it with wood floors.

We did the demo in late September because our electrician was going to be out of the country until October 14th and we wanted to get the wood flooring and drywall contractor to complete their work prior to our electrician returning. However things didn't quite go according to plan they never do in renovations. Once we completed the demo we realized that there was electrical that needed to be moved before the flooring could be installed. So we lived without a kitchen for 2 weeks until Traian came back to the states.

To make matters even more interesting the cabinets arrived 2 weeks ahead of schedule. So as I sit writing this there are 25 boxes filled with cabinets in our living room, but we have new wood floors and all the electrical work is done. Drywall should be complete in the next two days and cabinets installed before the weekend. Hopefully things will go according to plan, but as you can tell from this post in a renovation things never go according to plan!

1 comment:

  1. You are so knowledgeable, Kendall! We are dying for it to be complete so that we can eat your yummy food again. I am sure Andrew feels that way times ten. Did you help with the design as well? What colors and materials will you be using? I can't wait to see it!

    ReplyDelete